EGG Energy:
Strategic advantages
Expertise
Extensive experience in the realization of energy projects. Qualified specialist in complex construction management.Partnerships
- ACWA Power Company (Saudi Arabia); - Larsen & Toubro Construction (India); - KUBOTA Corporation (Japan); -Megha Engineering Infrastructure (India); -China National Technology Import and Export Corporation (China)Innovation
Striving to utilize advanced technologies. Improving efficiency and environmental friendliness.

Our completed projects
110-220 kV overhead power line, part of the double-circuit line "Toktopul ODC" - Kemin Lett".
110 kV substation "Kizil-Ravat-2" and 25km 110 kV power line in Uychinsky District, Namangan Region.
35/04 kV substation "Furkat-1" in Fergana Region
110 kV overhead power line, owned by LLC "CAMPALIA".
35 kV overhead power line, owned by LLC "Jom Passhot" in Nurata District, Navoi, 17km + substation 4000/35/10 kVA
35 kV overhead power line, owned by LLC "Jom Marable", from substation "Nurata", to the "Suvliz" facility of the MFY, 23km, with the construction of 4000/35/6 kV substation
Our ongoing projects in the Energy Sector:
The Construction of the Sazagan Solar Power Plant (1,000 MW) and a Storage Station (668 MWh)
Location:
- Sazagan district, Samarkand region, Uzbekistan
General information:
The project includes the construction of:
- 100 MW SPP – Sazagan district, Samarkand region
- 400 MW SPP – Olga settlement, Nurabad district, Samarkand region
- 500 MW SPP – Olga settlement, Nurabad district, Samarkand region
- 500 MWh storage battery station – Sazagan district, Samarkand region
- 500 MWh storage battery station – Karakul district, Bukhara region
- Electric grid infrastructure:
- 5 220 kV substations
- 1 intermediate substation 220 kV
- 1 system substation 500 kV
- 220 kV transmission lines (155 km) and 500 kV (342.44 km)
Investor: ACWA Power Company (Saudi Arabia)


Our ongoing projects in Aviation:
The Construction of a new airport
“Tashkent Gateway Hub”
Location:
- Approximately 20 km south of the existing Tashkent International Airport
Design capacity:
- Stage 1: Servicing 17 million passengers per year
- Final phase: Up to 60 million passengers per year
Investor: Vision Invest International (Saudi Arabia)
Our ongoing projects in the field of Information Technology:
The Construction of a Data Center in Tashkent
Capacity:
- The main data center – 250 MW (New Tashkent, 25 hectares of land)
- Additional project in Bukhara region – 40 MW with the possibility of expansion to 250 MW
Investor: DATAVOLT (Saudi Arabia)


More
than 138 skilled workers
120 technical engineers
18 Administrators
Our missions
To provide reliable and innovative energy solutions.
Our advantages:
Presence of experienced personnel for working live line during the maintenance and repair of power transmission lines.
The company takes pride in its highly skilled workforce: Each of our employees contributes their knowledge and experience to create the best products and services for our clients.


Licenses and Certificates:
Design and construction of electrical networks (CL, OHL) and installations (ODC, CDC, PP, DC, TS, KRU, RU) with voltages ranging from 0.4 to 500 kV.